ΩOhmReady
1

Select Your NEC Edition

Choose the code year your AHJ enforces — 2017, 2020, 2023, or 2026. Every calculation uses the correct tables and article numbers for that edition.

2

Run Your Calculation

Voltage drop, wire sizing, load calc, conduit fill, or OCPD — enter circuit parameters and get the answer with the full NEC derivation and controlling factors.

3

Organize by Project

Group calculations by job, panel, or feeder. Track every circuit across the project from bid through final inspection.

4

Export for the Permit Office

Generate a permit-ready PDF with calculation sheets, NEC references, and a summary table — formatted for the inspector, not the engineer.

Ready to get started?

Free during early access. Join the waitlist for early access.